| Case Study - Richmond Data Centre |
 |
 |
 |
 |
| The Brief: |
 |
| To supply, install, test and commission a complete generator installation in accordance with the specification. Comprising two generator sets, associated switchgear and control panels. Key requirement – the essential supply of life safety systems. |
 |
| The generator sets to be located on top of a tall building, at roof level and positioned in dedicated acoustic generator rooms. |
|
|
| Problems to overcome: |
 |
| • |
Weather |
 |
 |
| • |
Busy road which needed to be closed off |
 |
| • |
Position of 300 ton crane to be able to lift two generators (weight 40 tons) |
 |
 |
| • |
Confined space on rooftop in which to place sets |
 |
|
|
|
 |
 |
 |
 |
|
 |
 |
 |
 |